This construction and renovation waste sorting project in Luohuang, Chongqing, China, features two integrated mechanical processing lines with a combined design capacity of 500 tons per day.
The facility is designed to process mixed construction and renovation waste, including concrete, bricks, tiles, boards, plastics and other mixed debris.
The two-line arrangement combines mechanical feeding, size reduction, screening, conveyor transportation and material separation to classify incoming waste into different fractions for further recycling and treatment.
On-site footage recorded on October 26, 2026, shows the two processing lines, loader feeding operations, mechanical sorting equipment, conveyor systems and separated material streams.
1. Project Overview
| Project Parameter | Project Details |
|---|---|
| Project Location | Luohuang, Chongqing, China |
| On-Site Project Date | October 26, 2026 |
| Project Type | Construction and Renovation Waste Sorting |
| Feedstock | Mixed Construction and Renovation Waste |
| Number of Processing Lines | 2 |
| Combined Design Processing Capacity | 500 TPD |
| Main Processing Technologies | Mechanical Size Reduction, Screening, Conveyor Sorting and Material Separation |
| Main Equipment | Feeding Systems, Mechanical Processing Units, Screening Equipment and Belt Conveyors |
| Main Output Streams | Separated Mineral Materials and Other Recovered Waste Fractions |
| Equipment Provider | Guoxin Machinery |
The 500 TPD capacity refers to the combined design capacity of the two processing lines, not 500 TPD per line.
2. Two-Line Waste Sorting Process
The Luohuang facility uses two processing lines to handle large volumes of mixed construction and renovation waste.
Waste Receiving and Loader Feeding
Incoming waste is accumulated in the receiving area. Wheel loaders transfer the mixed materials into the feeding sections of the sorting system.
Mechanical Size Reduction
Suitable bulky and mixed materials are processed through mechanical size-reduction equipment before downstream screening and separation.
Conveyor Transportation and Screening
Heavy-duty conveyors transfer materials between processing stages. Large mechanical screening units classify the incoming waste into different size fractions.
Material Separation and Collection
Following mechanical processing and screening, different material fractions are discharged through designated conveyors and collected in separate areas for further handling.
The two-line arrangement allows the facility to distribute material processing across two integrated sorting systems.
3. Main Equipment Configuration
| Equipment | Main Function |
|---|---|
| Loader Feeding System | Transfer incoming construction and renovation waste |
| Magnetic Separator | extract and recover ferromagnetic materials |
| Waste Shredder Machine | Process suitable bulky mixed materials |
| Trommel Screen Machine | Separate materials by particle size |
| Waste Crusher | pre-processing and crushing construction waste and stone |
| Air Density Separator | Screening of materials by weight |
4. On-Site Video: Two 500 TPD Waste Sorting Lines
The following footage was recorded at the Luohuang construction and renovation waste sorting facility on October 26, 2026.
5. Material Separation and Resource Recovery
The sorting system is designed to separate mixed construction and renovation waste into different material fractions.
| Output Stream | Material Characteristics | Further Handling |
|---|---|---|
| Mineral-Rich Materials | Concrete, bricks, stones and tile fragments | Further crushing, screening or recovery |
| Lightweight Mixed Materials | Plastics, boards and other lightweight waste | Further sorting and appropriate treatment |
| Other Separated Fractions | Mixed materials discharged from the sorting process | Subsequent recovery or designated handling |
The final material composition and recovery quantities depend on the incoming waste characteristics and downstream processing configuration.
6. Project Engineering and Contact
The Luohuang project demonstrates a two-line mechanical sorting arrangement designed for 500 TPD of mixed construction and renovation waste.
Its main engineering features include coordinated loader feeding, mechanical size reduction, large-scale screening, conveyor integration and separate material collection.
The two-line configuration provides a coordinated processing arrangement for handling high volumes of mixed renovation and construction debris.
Guoxin Machinery provides construction and demolition waste sorting equipment and integrated processing configurations for construction waste recycling and resource recovery projects.
Contact our international waste sorting team:
Email: eve@guoxinmachinery.com
WhatsApp: +86 13673809725
Website: https://www.mswsortingmachine.com/
Related Solutions