We provide turnkey EPC solutions for large-scale construction and demolition (C&D) waste sorting plants, designed for recycling centers and professional waste processors worldwide.
Our scope covers system engineering, equipment integration, on-site installation, commissioning, and operator training, ensuring stable plant performance from day one.
With a single-point-of-responsibility model, we help clients reduce project risk, simplify coordination, and accelerate project delivery for C&D waste recycling and resource recovery.
Our Role as Turnkey EPC Contractor
-
Overall plant layout planning and process engineering
-
Core sorting equipment manufacturing and system integration
-
Civil work coordination and installation supervision
-
Electrical control, automation, and commissioning
-
Performance testing, handover, and operator training
What the Complete Turnkey Scope Includes (From Design to Commissioning)
We provide complete construction waste sorting plant solutions, including:
-
Project consultation and waste analysis
-
Process flow and layout, responsible for system design
-
Equipment manufacturing and supply
-
On-site installation & supervision
-
Electrical and automation system integration
-
Operator training and after-sales support
Each solution is tailored to optimize recycling efficiency and maximize project profitability.
[One-Stop EPC Service] > From Soil Analysis to Finished Aggregate—We handle the engineering, so you can focus on the business. [Request a Project Layout]
Typical Construction Waste Sorting Process Flow
-
Heavy-Duty Feeding: Handling oversized concrete blocks and rebar.
-
Primary Screening: Removing fine soil and sand at the front end.
-
Light Matter Removal: Using Air Separators to blow away wood, plastic, and paper from the heavy aggregates.
-
Metal Recovery: Overhead magnets to extract rebar.
-
Crushing & Sizing: (Optional) If the client needs specific aggregate sizes.
Project Delivery & Responsibility
- Single-point responsibility throughout the entire project lifecycle
- Clear project milestones and performance acceptance criteria
- Dedicated engineering and project management team
- On-site coordination during installation and commissioning
- One contract, one responsible party for project delivery
What Is a Construction Waste Sorting Plant?
A Construction and Demolition (C&D) Waste Sorting Plant is a heavy-duty integrated system engineered to process mixed debris from urban renovation and infrastructure projects. Unlike MSW systems, C&D plants prioritize the recovery of high-purity recycled aggregates and the separation of light combustibles for energy recovery.
Our turnkey solutions focus on removing impurities (wood, textiles, plastics) from mineral fractions, ensuring the final output meets international standards for recycled construction materials.
Key Applications of Construction Waste Sorting Plants
Our construction waste sorting solutions are suitable for:
-
Construction and demolition waste recycling projects
-
Urban renovation and demolition waste processing
-
Aggregate recycling and reuse
-
RDF production from C&D waste
Typical Project Applications
This solution is widely applied in Turnkey C&D Waste Sorting Plant for Recycling & Resource Recovery serving cement plants, waste-to-energy facilities, and alternative fuel supply chains.
Engineered for Heavy-Duty C&D Material Processing
Unlike standard MSW systems, a Construction and Demolition (C&D) Waste Sorting Plant is built to handle highly abrasive materials, including concrete debris, bricks, asphalt, and reinforced rebar. The core objective of our turnkey C&D solution is the high-purity recovery of recycled aggregates and the efficient removal of light-weight contaminants (wood, plastics, textiles).
Our process focuses on mineral fraction purification. By integrating heavy-duty vibrating feeders and high-velocity air separators, we ensure that the final stony fraction is free from organic matter, meeting the strict “recycled aggregate” standards for road base and new construction materials.
Construction Waste Sorting Machine Configuration in a Turnkey Plant
A construction waste sorting machine is rarely used as a standalone solution in large-scale construction and demolition (C&D) recycling projects. In practice, it is configured as part of a comprehensive turnkey construction waste sorting plant, which includes feeding, screening, separation, and material recovery systems.
In a turnkey C&D waste sorting solution, sorting machines are selected and configured based on waste composition, capacity requirements, and target output materials, such as aggregates, metals, and combustible fractions. This integrated configuration ensures stable operation, higher recovery rates, and optimized project economics.
C&D Material Recovery & Purity Standards
| Output Fraction | Primary Separation Technology | Output Quality/Purity | Industrial Application |
| Recycled Aggregates | Vibrating Screen + Air Separator | 95% – 98% (Inert) | Road sub-base, Backfill |
| Ferrous Metals | Overband Magnetic Separators | 99% Recovery | Steel mills / Recycling |
| Light Combustibles | High-Velocity Air Separation | 90% Energy Potential | RDF / SRF Production |
| Sand & Fine Soil | Trommel Screen (<10mm) | High Liberation | Landscaping, Brick making |
Capacity & System Customization
Construction waste varies significantly between projects. Our systems are designed based on:
-
Waste composition and contamination level
-
Required processing capacity
-
Recycling and reuse targets
-
Available land and site conditions
-
Budget and return on investment expectations
Typical system capacity ranges from 100 TPH to over 1000 TPH, depending on project requirements.
Construction Waste Sorting Plant Cost – Key Factors
The investment cost of a construction waste sorting plant depends on:
-
Processing capacity
-
Level of automation
-
Sorting accuracy and material recovery requirements
-
Integration with RDF or energy recovery systems
-
Local installation and infrastructure conditions
We provide project-specific cost estimates after evaluating your requirements and objectives.
Integration with RDF & Energy Recovery Systems
Construction waste sorting plants often play a key role in resource and energy recovery projects.
Our solutions can be integrated with:
This integrated approach improves overall project efficiency and long-term operational stability.
Why Choose Our Construction Waste Sorting Solution?
-
Proven experience in C&D waste sorting projects
-
Turnkey system design and delivery
-
Flexible configuration for different waste streams
-
Strong integration with RDF and WtE solutions
-
Reliable equipment performance and durability
-
Professional technical support and project management
C&D Waste Sorting: Frequently Asked Questions
Q: Are you an equipment supplier or a turnkey project contractor?
A: We act as a turnkey EPC contractor, providing complete C&D waste sorting plant solutions from engineering design to commissioning, rather than supplying standalone equipment only.
Q: Who is responsible for on-site installation and commissioning?
A: Our engineering team is responsible for on-site installation supervision, system commissioning, and performance testing to ensure stable plant operation before handover.
Q: How do you protect the equipment from damage by large concrete or rebar?
A: We use reinforced heavy-duty vibrating feeders and primary magnetic separators at the front end. If your feed contains oversized debris (>600mm), we integrate a primary jaw crusher to pre-size the material before it reaches the sensitive sorting units.
Q: Can the system effectively separate wet or soil-heavy C&D waste?
A: Yes. We utilize specialized “Anti-Clogging” trommel screens and multi-stage vibrating screens to remove fine soil and sand (0-10mm) first, ensuring the downstream air separators and optical units work on clean, dry materials.
Q: What is the main advantage of an EPC turnkey solution for C&D projects?
A: C&D sorting involves massive material weight and high dust. Our turnkey service covers environmental control (dust suppression), heavy-duty foundation guidance, and system-wide automation, ensuring your plant doesn’t suffer from frequent “wear and tear” downtime typical of low-end setups.
Start Your Construction Waste Recycling Project
If you are planning a construction waste recycling or sorting project, we are ready to support you with a customized solution.
Contact us today to receive:
-
Process flow proposal
-
Equipment configuration
-
Construction waste sorting plant cost estimation
Planning a C&D Waste Sorting for Recycling & Resource Recovery project?
We support turnkey plant design, equipment integration, and international project delivery.